Best riddles for teens

cleanfunnylogictricky

A man was driving a black truck. His lights were not on. The moon was not out. A lady was crossing the street. How did the man see her?
It was a bright, sunny day.
73.78 %
241 votes
simplecleanlogic

Two workmen were repairing a roof. Suddenly, they both fell down the chimney and found themselves in the large fireplace. One man`s face was smeared with soot and one wasn`t. The one with the clean face washed his and the dirty man did not and went back to work. Why?
When the two men looked at each other, the clean man thought his face was dirty as well. The dirty man, looking at the first's place, thought his was clean.
73.75 %
73 votes
logicsimplecleancleverstory

A woman who lived in Germany during World War II wanted to cross the German/Swiss border in order to escape Nazi pursuers. The bridge which she is to cross is a half mile across, over a large canyon. Every three minutes a guard comes out of his bunker and checks if anyone is on the bridge. If a person is caught trying to escape German side to the Swiss side they are shot. If caught crossing the other direction without papers they are sent back. She knows that it takes at least five minutes to cross the bridge, in which time the guard will see her crossing and shoot her. How does she get across?
She waits until the guard goes inside his hunt, and begins to walk across the bridge. She gets a little more than half way, turns around, and begins to walk toward the german side once more. The guard comes out, sees that she has no papers, and sends her "back" to the swiss side.
73.74 %
113 votes
interviewlogicmathclean

A man has two ropes of varying thickness (Those two ropes are not identical, they aren’t the same density nor the same length nor the same width). Each rope burns in 60 minutes. He actually wants to measure 45 mins. How can he measure 45 mins using only these two ropes. He can’t cut the one rope in half because the ropes are non-homogeneous and he can’t be sure how long it will burn.
He will burn one of the rope at both the ends and the second rope at one end. After half an hour, the first one burns completely and at this point of time, he will burn the other end of the second rope so now it will take 15 mins more to completely burn. so total time is 30+15 i.e. 45mins.
73.74 %
82 votes
logiccleverclean

Four people come to an old bridge in the middle of the night. The bridge is rickety and can only support 2 people at a time. The people have one flashlight, which needs to be held by any group crossing the bridge because of how dark it is. Each person can cross the bridge at a different rate: one person takes 1 minute, one person takes 2 minutes, one takes 5 minutes, and the one person takes 10 minutes. If two people are crossing the bridge together, it will take both of them the time that it takes the slower person to cross. Unfortunately, there are only 17 minutes worth of batteries left in the flashlight. How can the four travellers cross the bridge before time runs out?
The two keys here are: You want the two slowest people to cross together to consolidate their slow crossing times. You want to make sure the faster people are set up in order to bring the flashlight back quickly after the slow people cross. So the order is: 1-minute and 2-minute cross (2 minute elapsed) 1-minute comes back (3 minutes elapsed) 5-minute and 10-minute cross (13 minutes elapsed) 2-minute comes back (15 minutes elapsed) 1-minute and 2-minute cross (17 minutes elapsed)
73.74 %
82 votes